Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяCandidate
Male, 44 years, born on 31 March 1981
Malaysia, willing to relocate (Australia, Democratic Republic of Congo, Kazakhstan, Malaysia, Russia, Thailand, Turkey), prepared for business trips
Permit TO Work, LOTO-Isolation, SIMOPS, HSE expert
5 000 $ in hand
Specializations:
- Other
Employment: full time, project work, work placement
Work schedule: full day, shift schedule, remote working, rotation based work
Work experience 19 years 10 months
November 2016 — currently
8 years 6 months
EGA- Emirates Global Aluminum
UAE, www.ega.ae/
Commissioning / Start-up & Production – Lead Isolation and permitting
EGA is the very first Alumina refinery in UAE estimated production capacity 2 million Ton Alumina per year in Phase 1 continues the same production in Phase 2 & 3. The alumina transferred to a pipe conveyor to the alumina silos at the adjacent Smelter for final product and exports as customer's required in different quality and Shapes. Process includes- Digestion, Clarification, Hydrate / Precipitation, Calcination and Smelting
Role:
Ensure the scheduled task has been completed on time as per the daily PTW review dissection with leads.
As a PTW key person liaise with senior management and contractors for smooth Construction & SCU activities.
Effective communication with workforce to identify the effectiveness of PTW and LOTO implementation.
Coordinate various CSU activates ensuring the Isolation points are in required position prior to issue PTW
Effective discussion and witnessing with Leads and Workforce to ensure the control measure are implemented
Carefully review documents and energy sources prior to mark isolation point in production equipment.
Preparing LOTO materials, Tags and witnessing Isolation with various Isolating Authority when perform LOTO.
Ensure the energy sources and hazards are controlled for commissioning, Start up and Production activities.
Issuing PTW for designated task as per the job planning in priority wise in CSU and Production area.
Coordinate with work force and CCR for short test or De-isolation for startup test as scheduled for a timeframe.
Continues do LOTO / PTW audits to ensure the safety of workforce and the facilities.
Do proper documentation of all Isolation certificates and PTW together with the attachments.
Display the job exclusion zone and ensure PA is aware it before issue PTW and Isolation certificates.
Ensure the overall safety of the task, Energy sources and equipment has been Isolated with correct tagging
Controlling LOTO & materials, Verifying at site to ensure the safety for every direct or indirect related activity.
Contributing the best for ensure the effectiveness of “Life Saving Rules” prior to issue the Permit to Work
Develop and provide PTW coaching and training to the workforce to improve the deficiency in PTW system.
Examine sufficient documents avail with PTW for Safety critical equipment inhibition and Override application.
Responsible to coordinate daily activities with line manager, Production & Maintenance Supervisor, CSU, Company discipline leads and CTR for priorities the Task for avoid SIMOPS clashes and potential of Incidents.
Effectively coordinating PTW and SIMOPS as per Operation MOPO Matrix for safe and smooth business days.
Liaise with PA for various types of PTW’s more than 125 (peak time) with sufficient risk controls & Task details.
Well experienced in reviewing relevant Technical loop diagrams, P & ID to ensure the accuracy of PTW & LOTO.
Experienced for SIMOPS Coordination in Dynamic Commissioning, (ATEX) EX-Inspection in critical Equipment.
Provide management training, Strong problem solving & organizational abilities for maintain good teamwork.
Hands of experience in keeping PTW, LOTO & SIMOPS records of every activity as electronically as well
Experienced in site PTW / LOTO audits and well maintaining the records for improve PTW system effectively.
Updating exclusion Zone for critical activity as N2He Pressure Test, Radiography & Breaking containments
November 2015 — October 2016
1 year
TOTAL
SIMOPS- Permit To Work / LOTO Coordinator
Maharaja Lela South Gas Process Plant in Brunei which is a Gas sweetening process (Removing CO2, H2S, Mercury etc.) exporting to BLNG for gain final LNG product.
Role:
Carefully Verifying PTW ensuring task Description details and relevant supporting documents P & ID, ICC-Isolation certificate, JHA, Method of statement, hazards control are sufficient enough for commence the activity.
Review heavy lifting documents and Coordinate daily Permits for performing lifting nearby or inside the live facility to avoid potential clashes with other priority jobs as scheduled
Efficiently verifying P & ID, Electrical & Instrument loop diagrams coordinating overall permit to Work / LOTO system and related Lock Out- Tag Out materials accordingly on activity planning.
After review of PTW Make available for respective personal’s endorsement accordingly on time for approve and duly make ready for both shift.
Based on the PTW / SIMOPS job planning display PTW in the Permit rack and ensure PTW signing by the right performing Authority for each shift.
Effective coordination between CCR, PA and Operation team for Safety Inhibition / Override, Process / Mechanical Isolation and Lock-Out / Energization Certificates are accordingly applied.
Frequently communicating with CCR to ensure the planning activities PTW opened accordingly, for ensure the PTW effectiveness properly done by Performing authorities and displayed PTW copies in designated place.
Prior to issue PTW final review and ensuring changes of Isolation / De Isolation states every shift (Day / Night)
Special attention in Coordinate PTW and LOTO for HV / LV circuits termination or Disconnect for Motor test run
Daily PTW discussion with Leads for Prioritize the upcoming activities in advance for avoid potential work clash.
Effective Coordination in PTW / SIMOPS for Day +1 activity with TSM, Production, Maintenance superintendent, CTR leads and Snr Electrical person.
Reinforce PA to cascade the work conflicts to the workforce for avoid potential hazards in simultaneous activity.
Special attention in HOT work (Naked flame) activity take place in process area close with live facilities.
Ensure accuracy of test pack permits, P & ID, process / Mechanical Isolation accordingly participating line walk.
Respectively maintain Naked Flame & Non Naked Flame Permits accordingly on site HOT work procedure.
During SIMOPS meeting Re-evaluate the potential of risk for each Task in PTW for to ensure the Safe work environments and safety commitments.
Special attention in PTW - SIMOPS Coordination for performing LOTO in same equipment for multiple Pre- com and commissioning activities, liaise with other departments accordingly for “LONG TIME ISOLATION”
Strong Coordination in Excavation PTW to ensure the underground felicities are safe, specifying measurements
and method of work execution (Manual or Mechanical)
Coordinating PTW effectiveness for dynamic commissioning with operation teams for LOTO implementation
Maintaining strong coordination between various disciplines Leads, PA, IA to ensure the PTW effectiveness.
Participate Safety speech in mass TBT for motivate the workforce to improve their safety culture for every activity should execute with valid Permit to Work.
Coordinating commissioning activity isolation in live MCC with CCR and Snir.Isolating authority before issue PTW
Ensure in the PTW all the Production and commissioning activities execute accordingly in safe manner, NO harm to the live facilities.
Close work with planning team, coordinate with PA for prepare their PTW for advance review to avoid job delay.
Good PTW coordination for shutdown / Turnaround activities scheduled for HOT Tie –in scopes with existing facilities, Vessel entry for wash down, valve overhaul, demolish & re-instantiate, replace strainers, E & I scopes.
Carefully verifying MSDS and ensure the safety precautions are taken place when Hazardous material handling
October 2015 — November 2015
2 months
Alstom
Heavy Engineering... Show more
Completion/ Commissioning & Start-Up- PTW/ LOTO Engineer
Experienced in SCU PTW/LOTO Engineer with ALSOTM Power in Tanjung Bin Coal Power plant Deliver 1,000MV
Ensure the scheduled task has been completed on time as per the daily PTW review dissection with leads.
As a PTW key person liaise with senior management and contractors for smooth Construction & SCU activities.
Effective communication with workforce to identify the effectiveness of PTW and LOTO implementation.
Coordinate various CSU activates ensuring the Isolation points are in required position prior to issue PTW
Effective discussion and witnessing with Leads and Workforce to ensure the control measure are implemented
Carefully review documents and energy sources prior to mark isolation point in production equipment.
Preparing LOTO materials, Tags and witnessing Isolation with various Isolating Authority when perform LOTO
Review PTW Supporting drawings and Liaise with PA, Permit approver-AA, Isolating Authority-IA to ensure the Isolation points are technically sufficient to control the energy source from potential of hazards.
In Coordination of Process PTW for Electrical circuits and Process valve Isolation for braking containment for strainer cleaning , replacing Valve or gasket ensuring the full safety for “No Harm No Leak”
December 2011 — September 2015
3 years 10 months
Oil and Gas... Show more
CSU-Production: Permit to Work / SIMOPS Coordinator
Carefully review and Co-Coordinate PTW (Paper and Electronic version) for completion, CSU and production activities accordingly each Deck include Hull, Topside & Overboard.
Efficiently managing and taking care overall Permit to Work system-ISSOW (Integrated Safe System Of Work)
Ensure all activities are streamlined company work policy, operating requirements, safety Standards and
Processes are in order before endorsing Permit to Work
Prior to verify a PTW (WCC-Work control certificate) ensuring the task Description details, method of statement, JHA - Job hazards controls and relevant documents are sufficient enough to commence the activity.
Carefully Verifying PTW supporting documents Location map, P & ID, ICC-Isolation, Inhibition certificates and other project mandatory documents.
Review PTW Supporting drawings and Liaise with PA, Permit approver-AA, Isolating Authority-IA to ensure the Isolation points are technically sufficient to control the energy source from potential of hazards.
In Coordination of Process PTW for Electrical circuits and Process valve Isolation for braking containment for strainer cleaning , replacing Valve or gasket ensuring the full safety for “No Harm No Leak”
Strong coordination to ensure the 100% Process safety in SIMOPS activity closed by H2S and Hydrocarbon.
Good coordination with Isolating Authority to ensure Isolation / DE-Isolation, EPI (Long time Isolation) are
Performing as per the LOTO procedure should ensuring workforce and equipment are safe.
Prior to endorse Permit doing site visit together with PA ensure the site condition and work related hazard controls are in place, any additional requirement need liaising with PA and Permit Approver – AA.
Actively conducting daily Permit To Work / SIMOPS meetings with OIM (SC-Site Controller), Lead Disciplines, Operation/Maintenance- Superintended, subcontract management and circulating daily updates to higher level.
Prior to issue PTW review and ensuring changes of Isolation / DE-Isolation states every shift(Day / Night)
Special attention in SIMOPS coordination for performing LOTO in same equipment for multiple activities.
Strong coordination in PTW effectiveness for system dynamic commissioning and Ex Inspection.
Carefully reviewing PTW and coordinate with CCR for MOS / Override certificates of safety critical element for CM, PM or CSU activity avoid SIMOPS Clash or trigger Unexpected Emergency Alarm.
Ensure applied SSIC (Safety System Isolation Certificate) for safety critical equipment Inhibition / Overriding for PM/ CM activity in BPCS / IPS systems.
Review SAP for effective SIMOPS for priorities Plant routine maintenance activities to be done accordingly.
Co-ordinate high risk activities PTW for Heating medium, Pressurized system, N2He Leak testing, Hydro testing, Tie-In scope, fire water network, Purging, CSE, Hot work , Lifting, and scaffolding work cascading the information to nearby workforce in order to displaying Risk exclusion zone at PTW office board.
Effectively Coordinate process ICC’s familiar in Valve Interlock keys, Pad locks, Nether locks, Pro-locks system
Coordinating Electrical PTW for MCC, SB, DB, Temp. Power supply units Isolation, DFT, and energizing activities.
Maintain competency records (Letter of appointment) ensuring right personals are involved in each stage of Permit approval and arranging refreshment course with training department when validity expires.
Maintaining good communication with workforce and ensuring the PTW Task descriptions, hazard identifications are clearly understood and duly signed in TBT attendance sheet while doing site PTW audit.
Monitoring efficiency of PTW at site to ensure zero deficiency and no potential gaps associated while do activity
Conducting CSE Coordination meeting with PA, AA, ERT, HSE and AGT for prepare risk matrix, JHA and hazards controls are mitigated prior to process Confined space Entry permit.
Work closely with HSE prior to issue PTW for Hot work, CSE,Pressure testing and overboard activity by Abseilers
Well Coordinating PTW for execute any DCN scope in process and production area ensure strong interaction done between higher level management and subcontract discipline leads.
Conducting group discussion and meetings for give more attention to face emergency situations successfully.
Doing effective site audit to ensure PTW system and HSE policies are being consistently followed by the PA.
Prior to issue 500 m. Vessel boundary permit effectively coordinating with OIM, CCR, Subsea lead, Radio operator and Vessel CSR for subsea work (RO operation and Umbilical line) or logistic delivery
Report directly to the Offshore Installation Manager (OIM) guiding Three PTW Controllers in one shift.
May 2008 — November 2011
3 years 7 months
Oil and Gas... Show more
CSU-Process Permit To Work Coordinator
Carefully Verifying PTW ensuring task Description details and relevant supporting documents P & ID, ICC-Isolation certificate, JHA, Method of statement, hazards control are sufficient enough for commence the activity.
Review heavy lifting documents and Coordinate daily Permits for performing lifting nearby or inside the live facility to avoid potential clashes with other priority jobs as scheduled
Contribute strong Leadership in Safety, ability for to ensure the proper Risk analysis, Hazard identification and controls are effectively implemented as per the Project specific safety Plan and SIMOPS plan for every activity.
Leading the PTW / SIMOPS daily meeting and prioritizing the activity controlling the work clashes.
Genuinely concerned for skilled team work in KPI’s analysis and contribute improvement suggestions
April 2006 — April 2008
2 years 1 month
Tecnimont
HSE- Permit To Work Coordinator
Aromatics complex will produce 829,000mt of paraxylene and 393,000mt of benzene annually. The ethane and propane produced will be sent to the Olefins II complex to produce extra ethylene of 100,000mt per annum
July 2005 — March 2006
9 months
Daelim- Middle East, Kuwait
Permit To Work Coordinator
Carefully Verifying PTW ensuring task Description details and relevant supporting documents P & ID, ICC-Isolation certificate, JHA, Method of statement, hazards control are sufficient enough for commence the activity.
Review heavy lifting documents and Coordinate daily Permits for performing lifting nearby or inside the live facility to avoid potential clashes with other priority jobs as scheduled
Skills
Skill proficiency levels
About me
A result oriented professional with over 11 years of cross cultural experience in the areas of Safety, Permit To Work / SIMOPS Co-ordination / LOTO in Construction, Pre-Com, Commissioning & Start-up, Power Plant, Petrochemical, Alumina, FPS, Drilling, Subsea, Mooring, Hull & Topside, Production and Process onshore / offshore Facilities’
Higher education (bachelor)
2007
Luna Institute of Engineering Technology
Mechanical, Instrumentation Systems of Mechanical Engineering Production
2004
Govt.BTC
Instrument Mechanic In Chemical Plant, INSTRUMENTATION ENGINEERING AND OPTICAL ENGINEERING
2002
Mar Gregarious Collage Tiruvalla Kerala, India
Diploma in Instrumentation, Electronic Instrumentation and Devices
2000
Indian Technical Education Council, Govt. of India
Diploma in Fire and Safety, Fire Safety
Languages
Professional development, courses
2012
ISSOW Version 4.07 (Integrated Safe System of Work)
Certification by Petrotechnics., PTW-LOTO production
2011
ELECTRONIC PTW ISSUING CERTIFICATION.
Certification by Petrotechnics, PTW-LOTO
2010
Institute Of Leadership and Management
Qatar International Safety center W.L.L, HSE
Tests, examinations
2015
ISSOW- Level II
Petrotechnics, Permit to Work- LOTO
2013
NEBOSH
Nebosh -UK, Occupational Health and Safety
Citizenship, travel time to work
Citizenship: India, Malaysia
Permission to work: India, Malaysia, Singapore
Desired travel time to work: Doesn't matter